Friday, March 21, 2014

Week 6 Progress

The house is coming right along. From the outside at least the major things completed this week have been the siding, shutters, trim, and garage door.


The project manager called me this afternoon to give me an overall progress update. In addition to what I noted above several other things have been completed as well. The big thing inside is that drywall has been hung. And just this afternoon the water, sewer, and gas lines were finished, inspected, approved, and buried. He also told me that the sidewalk had been pulled up and re-poured because he wasn't pleased with the finish on the original one. I've arranged to meet him Monday afternoon to do another walkthrough to see the progress on the inside and take pictures. 