Friday, April 4, 2014

Drywall and Primer

I've been a little behind on updates on here. The day after my last post on Week 6 progress we had the dreaded stomach virus make it's miserable way through our house starting with our youngest son. It delayed the drywall walkthrough as the day I was originally supposed to meet with the project manager I was feeling half dead and had to postpone it with him a few days.

When I finally met with last week not only was the drywall up but the first coat of primer had been put on the walls as well. He explained to me that painting is a multistep process done over the course of a week or so with primer, patching, paint, more patching, and another layer of paint added before it's finished. The kitchen and bathroom cabinetry had also been added with everything covered in plastic to keep it protected from stray paint.

On the outside the driveway was in the final stages of paving when I arrived for the walkthrough. Gutters had also been installed. With a lack of trees in our yard leaves won't be much of an issue but at some point I plan to get some sort of cover installed on those. Getting up on a ladder to clean the gutters on my existing one story house has been difficult enough and I definitely won't be climbing high enough to reach the second story on this one.

The project manager asked me not to include a picture of it but he was also going to be tearing up the sidewalk and getting it re-poured for the third time. I mention this because I've really appreciated his attention to detail and it seems like everything Jenny and I have noted as potential issues during construction he's already seen and made note of. The previous two pours of the sidewalk looked fine to us and we never would have thought to ask about it. But clearly he saw a problem both times warranting redoing it. I've also really appreciated his constant communication throughout the build. He's called at least once if not twice a week and always been willing to meet me for a walkthrough. As I've noted before Jenny and I have read through numerous other Ryan Homes building blogs and at least some of them have noted a lack of communication from the project manager but this has certainly not been an issue for us. 

On to photos:

Paved driveway.

Rear of house. Note the safety railing covering the sliding door. After we move in my brother-in-law is going to add a simple set of steps for us until we can build a deck. We opted not to one built during initial construction as our sales rep told us that their cost was around twice as much as what we could have it added for later. We're also probably going to add a patio of some sort too.



Drywall in the garage. Fairly soon after we move in I'm going to be finishing the walls and painting them white. I did something similar in my current garage (except I finished them with plywood) and it made a big difference in brightening it up and making it easier to see in there.

Kitchen with cabinetry installed.

Morning room.


Another view of the morning room with plastic covering the sliding door.

Dining and living room.

Stairs.

Bedroom #2.

Hallway bath upstairs.

Bedroom #3.

Laundry room.

Master bedroom.

Master bedroom bath with tile installed around the tub.

Master bedroom closet.


No comments:

Post a Comment