Wednesday, February 19, 2014

Week 2 Progress

The project manager called me Monday afternoon and let me know what the plan was for this week. The forecast was for mostly dry and warmer weather all week so they were hoping to get a lot accomplished. Foundation completed, French drain around the perimeter of the crawlspace installed, garage floor poured, and lumber delivered for framing to start next week.

With living two miles from the lot and passing by the neighborhood at least twice a day we've been stopping by every afternoon to see the progress.



When I stopped by Monday afternoon there were huge piles of gravel and a bobcat scooping it up and dumping it around the inside edge of the foundation to build the French drain as well as to form a layer below the vapor barrier.


Tuesday afternoon plastic had been laid down in the garage and in the crawlspace. I've been told that the garage floor will be poured directly on top of the plastic.


Today I went by and the front porch had been built along with a pile of lumber sitting on the lot awaiting framing. I also had a chance to walk around the perimeter and take a few additional photos.

Close up of the garage.

Side by the living room looking towards the kitchen, dining room, and morning room.

View from the rear.

Pile of lumber for framing. 